Jordan River Parkway:
Salt Lake County
Trail Completion Prioritization Report

Recommendations

 

General

•  Follow environmental guidelines for all trail development

•  Coordinate with all responsible jurisdictions for:

•  Rights-of-way acquisition

•  Design

•  Funding

•  Other issues

•  Involve public – especially volunteers

•  Provide adequate trail maintenance

•  Assure trail safety

•  Work with communities in Davis and Utah Counties to address their trail needs

•  REMEMBER THE TRAIL DOES NOT END AT THE COUNTY LINE . The trail needs in Davis and Utah Counties should be considered.

Section A — 10th North to the Davis County

Priority #6

•  Funding to pave the trail from 1000 North to Redwood Road has been approved and this should be paved this year.

•  The section from Redwood Road to Davis County should be planned as the Sports Park concept develops.

Section B — North Temple to 250 South

Priority #8

•  Salt Lake City should move forward with funding for design work.

•  In the meantime, discuss options with land owners.

•  Completion of the trail will be a few years from now.

Section C — Unpaved Trail from 37th to 39th South

Priority #1

•  Salt Lake County should fund this for paving.

Section D — 86th to 90th South

Priority #4 (temporary route) Priority #9 (long-term route)

•  It is impossible to estimate when the land north of 9000 South will become available for the long-term trail route.

•  In the meantime, the temporary solution along 700 West should be built.

•  Sandy City can work with UDOT to improve 700 West and 9000 South and plan the 9000 South crossing.

•  Sandy City can complete the gap in the trail on the south side of 9000 South.

•  The County and Cities can work on the design and cost estimates for the trail.

Section E — 94th to 98th South

Priority #5

•  It is impossible to estimate when the land north of 9800 South will become available for the trail.

•  In the meantime, Sandy City , West Jordan City and South Jordan City can work with the canal company to improve the existing canal crossing.

•  The cities can work on design and cost estimates for the trail.

Sections F & G — 114th to 118th South

Priority #3

•  The bridge at 11400 South needs to be put in as soon as possible.

•  Set up stakeholder process to determine priority trail route(s).

Section H — 146th to the Jordan Narrows Trailhead

Priority #7

•  Bluffdale should be supported in its efforts to complete this section. It will take a lot of time, negotiations and funding to complete.

•  Coordinate with UDOT on highway and trail crossing.

Section I — Washout at the Jordan Narrows

Priority #2

•  This is a repair/maintenance job, although some re-design is advisable. Salt Lake County will begin construction next year on a trailhead on Sunrise Dr. (north of Camp Williams and the Veterans Memorial Cemetery , approximately 170th South and 12th West.) It makes sense to repair the trail and have this relatively cheap and easy section intact.

 